Next-generation timing and synchronization from Oscilloquartz (OSA), with GNSS security built in. Our first pilot project in Cambodia ran from August to September 2026.
IEEE 1588v2PTP grandmaster
48PTP ports
Sub-nsWhite Rabbit support
Aug–Sep 2026first pilot, Cambodia
Product line
Oscilloquartz (OSA) solutions
Grandmasters and modular sync platforms for carrier-grade and enterprise networks.
PTP · NTP · GNSSOSA 5412 / 5422IEEE 1588v2 PTP grandmaster with multi-band GNSS receiver. Configurable as PTP grandmaster, White Rabbit, boundary clock or SSU/TSG, with optional OLED display and rubidium clock.
Next-gen grandmasterOSA 5430 / 5440 NG GMHigh-capacity grandmaster and SSU with multi-port line cards for scalability, managed with SyncDirector.
Modular platformcoreSync / edgeSyncSoftware-defined, distributed timing for 5G O-RAN front and backhaul, running on Linux-based OSA SoftSync.
Specifications
OSA 5412 / 5422 key specifications
IEEE 1588v2 PTP
Grandmaster clock (ITU-T G.8275.1 and G.8275.2)
NTP server
Stratum-1 NTP / SNTP server with GNSS reference
GNSS receiver
Multi-band: GPS, GLONASS, BeiDou, Galileo and IRNSS
Sync interfaces
BITS (T1/E1), 1PPS, 10MHz, ToD, SyncE
Clock output
Up to 48 PTP ports, configurable as BC or TC
White Rabbit
Sub-nanosecond synchronization support
Security
Four layers of GNSS protection
Jamming and spoofing detection from the antenna to the network.
Layer 1: AntennaAnti-jam and anti-spoof antennas with threat alarms as the front-line defence.
Layer 2: ReceiverMulti-constellation, multi-band receivers with jam and spoof monitoring, mitigation and alarms.
Layer 3: DeviceSyncJack technology compares two GNSS receivers to detect location, phase and time anomalies.
Layer 4: NetworkMosaic SyncDirector monitors and verifies all network clocks, GNSS and PTP, in real time.
Key benefits
Why operators choose OSA
Modular hardwareField-upgradeable design with an OLED display for local status.
Built-in testSyncJack built-in test and measurement tool.
aPNT+Assured positioning, navigation and timing with jamming and spoofing mitigation.
First pilot project
Installation and commissioning in Cambodia
August to September 2026.
Telecom cabinet wiring and installationMaterials and equipment staging