A selection of in-building, telecom equipment, time synchronization and energy projects delivered by A.E. in Cambodia and Thailand.
Full-mall indoor coverage with a multi-floor DAS and MIMO, designed to give consistent signal and capacity across a large public venue.
Neutral-host in-building system for a mixed-use high-rise, with a point of interface and DAS shared by several operators.
Our first Oscilloquartz timing project in Cambodia, from site preparation to acceptance testing and handover to the client.
Tower work, radio and microwave installation and commissioning, carried out by trained teams under strict work-at-height safety rules.
RF engineering · Cambodia
Drive test, optimization and swap projects delivered per year for Huawei, ZTE, Nokia and Monolith equipment, for Smart, Cellcard, Seatel and EDOTCO. 2026 is the year to date.
In the field


